Case Study 3: Australian Mineral Sands Projects
The Task
How to move mineral sands from a mine in Broken Hill for export via a Port in Adelaide, Australia. The journey totals 600 kms from Broken Hill to Port Adelaide via rail.
The Solution
Supplying 1,750 x 20’ bulk mining containers suitable for tippler de-cantering, delivered in time into Adelaide for the loop to start.
The Logistic Process;
- The containers are loaded at the mine site.
- The lids are placed onto the containers.
- The containers are then railed to the port.
- The containers are stacked and waiting for the ship to arrive.
- When the ship arrives, the containers are taken to the quay side to be unloaded via a tippler.
- The containers are taken back to the mine to start the loop again.
Rotainers Videos
Our rotainers have been used across the globe. Check out some of the videos of them in action.